Time
Time is money. You may need to know
the cost of the part before you start. To calculate the amount of time
to machine you must calculate the following:
1. The RPM of the end mill.
RPM=Cutting Speed
x 4 divided by the End Mill Diameter
RPM is defined as
revolutions per minute of the cutting tool. Cutting speed is defined as
the speed or motion of the cutting tool in the machining operation. In
this formula the cutting speed for nylon is 200 and aluminum is 300.
2. The speed of the end mill path.
(feed rate)
Feed=FT x T x RPM
In this formula
FT=.005 T=# of flutes on end mill.
HINT: You have
already chosen a 2 or 4 flute end mill! If not, refer to Milling Instructions.
HINT: The
answer is in "inches per minute".
3. Multiply your answer for #2 by
the amount of distance traveled in inches to obtain a time estimate of
manufacturing this part!